T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
FRAME 17
Install End Plate:
1.
2.
NOTE
Use this task to install either of two end plates (1).
Line up holes (2) in end plate (1) with holes (3) in guide supports (4).
Screw in and tighten four machine screws (5) and new Iockwashers (6) with
screwdriver.
Follow-on Maintenance:
1. Install terminal board assembly; refer to task 16.
2. Install plate; refer to task 17.
3. Install digital subsystem assembly A3; refer to task 18.
4. Install circuit card assemblies A2, A3, A4, A5, A6, A7, A9, A10, A13, and A14;
refer to task 19.
5. Install electrical card holder; refer to task 20.
6. Install thermal system test controller; refer to para. 2-5, task 8.
7. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 15 ENDS HERE
Volume IV
2-148
Para. 2-7, Task 15