T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
FRAME 19
Install Terminal Board (Continued):
Wiring Chart for Terminal Board
From
TP1
TP2
TP3
TP4
TP5
TP6
To
J1-D1
J1-H1
J1-A5
J1-A6
J1-A7
J1-B3
From
TP7
TP8
TP9
TP10
TP11
To
J1-B4
XA04-A70
XA04-A68
XA05-B66
XA05-B29
Follow-on Maintenance:
1. Install plate; refer to task 17.
2. install digital subsystem assembly A3; refer to task 18.
3. lnstaIl circuit card assemblies A2, A3, A4, A5, A6, A7, A9, A10, A13, and A14;
refer to task 19.
4. Install electrical card holder; refer to task 20.
5. Install thermal system test controller; refer to para. 2-5, task 8.
6. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 16 ENDS HERE
Volume IV
Para. 2-7, Task 16
2-151