T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 8
InstalI Connector P3:
1.
Measure and cut four 1-inch pieces of new MlL-1-23053/5-102-0 sleeving (1) and
six 1-inch pieces of new MIL-1-23053/5-103-0 sleeving (1) with rule and knife.
2. Slide sleeving (1) on wires (2).
3. Solder wires (2) to terminals (3) of new connector (4).
GO TO FRAME 10 STEP 5
WIRING TABLE CONNECTOR P3
A
ORANGEWHITE
C
ORANGE
24 GAGE
D
BLACK
F
BLACKWHITE
H
BROWN
K
BROWN
N
BLACK
18 GAGE
P
BLUE
Y
GREEN
C
YELLOW
Volume IV
Para. 2-8, Task 6
2-174