T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
F R A M E 30
Install Electron Tube Assembly and CRT Support (Continued):
1.
Connect lead A3P2 (1) to jack J1(2) and connect lead A3P1 (3) to jack J2 (4) on
power supply (5).
CAUTION
Jack screws (6) will tighten or loosen only one side of
electrical plug connector A3P3 (7) at a time. To avoid
cracking plug A3P3 (7), turn jack screws (6) alternately.
2.
Connect plug A3P3 (7) to receptacle connector (8) and alternately tighten two jack
screws (6) with flat tip screwdriver.
Follow-on Maintenance:
1. Install cover; refer to task 17
2. InstalI IDU assembly A2; refer to task 18
3. InstalI thermal system test controlIer; refer to para. 2-5, task 8.
4. InstalI thermal system test controlIer case cover; refer to volume 1, para. 4-18.
TASK 14 ENDS HERE
Volume IV
Para. 2-8, Task 14
2-205