T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
TASK 2. Repair Front Panel Connectors Bracket.
Applicability All Models
Common Tools:
Drill, 1/4-inch
Drill Bit, 1/16-inch
Hammer, balI peen
Pin, drift
Special TO OIS: N o ne
Supplies:
NOTE: Expendable supplies are defined in volume 1, appendix C.
Film, chemical (Item 12)
Nut, self-locking, plain (96906) MS21076L08 (five per bracket)
primer (Item 23)
Rivet, solid (96906) MS20426AD3-6 (10 required)
Personnel: Two
Soldier A: Repairs front panel connectors bracket.
Soldier B: Helps Soldier A.
Equipment Condition:
Thermal system test controlIer on a clean work surface.
Preliminary Procedure:
1. Remove thermal system test controller case cover; refer to volume 1, para. 4-17.
2. Remove thermal system test controller; refer to para. 2-5, task 2.
3. Remove panel assembly A1; refer to para. 2-6, task 1.
4. Remove power module A6 for access only; refer to para. 2-9, task 1.
5. Remove IDU assembly A2; refer to para. 2-8, task 1.
6. Remove front panel connectors bracket; refer to task 1.
Volume IV
Para. 2-13, Task 2
2-325