TM 5-4520-208-15
CHAPTER 2
INSTALLATION AND OPERATING INSTRUCTIONS
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
electric motor power unit is installed.
7. Unloading Equipment
The gasoline engine power unit is
a. General. The BT400-40 and BT400-40-1
shipped packed in a separate card-
heaters may be received as towaway items or in
wood shipping crates. Instructions provided in
board box.
this section will cover either mode of shipment.
(2) The flexible air hose and the duct
b. Uncrated Equipment.
adapters are shipped packed in two
(1) The heater is shipped assembled (fig.
separate cardboard boxes.
4). On
Model BT400-40 heaters the
Figure 4. Heater shipping details.