T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
FRAME 22
Install Connector:
1.
Using insert tool, install wires (1) in new connector (2).
2. Position connector (2) on enclosure (3). Screw on two nuts (4), lockwashers (5),
washers (6), and keys (7).
3. Torque nuts (4) between 5 and 6 pound-inches (0.57 and 0.68 Newton meter) with
socket, torque wrench, and combination wrench.
Follow-on Maintenance:
1. Install power module A6; refer to task 22.
2. Install thermal system test controller; refer to para. 2-5, task 8.
3. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 11 ENDS HERE
2-246
Volume IV
Para. 2-9, Task 11