T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 3
InstalI PCU (Continued):
1.
Connect electrical plug connector A6A1P1 (1) to receptacle connector A6A1J1 (2).
2. Connect electrical plug connector A6A1P2 (3) to receptacle connector A6A1J2 (4).
3. Connect electrical plug connector A6A1P3 (5) to receptacle connector A6A1J3 (6).
Follow-on Maintenance:
1. Install power module A6; refer to paragraph 2-9, task 22.
2. Install thermal system test controller; refer to para. 2-5, task 8.
3. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
END OF POWER CONTROL UNIT (PCU) A6A1 MAINTENANCE
Volume IV
Para. 2-10, Task 2
2-279