T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
FRAME 39
Install Power Module A6 (Continued):
1.
Raise power module (1) and align holes in power module (1) with holes in chassis (2).
2..
Screw in ten machine screws (3), new Iockwashers (4), and flat washers (5) with
screwdriver.
3. Torque screws (3) between 10 and 20 pound-inches (1.1 and 2.3 Newton-meters) with
torque screwdriver, and No. 2 cross tip bit.
Follow-on Maintenance:
1. Install thermal system test controller; refer to para. 2-5, task 8.
2. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
END OF POWER MODULE A6 MAINTENANCE
Volume IV
2-274
Para. 2-9, Task 22