T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
TASK 21. lnstall Connector Bracket.
Applicability: All Models
Common Tools:
Bit, cross tip, No. 2
Screwdriver, cross tip, No. 2
Special Tools:
Wrench Set, socket, 12285468
Supplies: None
Personnel: One
Equipment Condition:
Thermal system test controller on a clean work surface.
Preliminary Procedure:
Remove connector bracket; refer to task 2.
2-270
Volume IV
Para. 2-9, Task 21