T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 35
Install Circuit Card Assembly A2:
1.
Screw in four machine screws (1), new lockwashers (2), and flat washers (3) on
circuit card A2 (4) with cross tip screwdriver.
2. Connect receptacle connector P1 (5) by screwing in and tightening two screws (6) on
connector (5) to receptacle J1 (7) connector with flat tip screwdriver.
3. Using torque screwdriver and cross tip bit, torque four screws (1) between 6 and 7
pound-inches (0.68 and 0.79 Newton meter).
Follow-on Maintenance:
1. Install power control unit A6A1; refer to para. 2-10, task 2.
2. Install power module A6; refer to task 22.
3. Install thermal system test controller; refer to para. 2-5, task 8.
4. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 19 ENDS HERE
Volume IV
Para. 2-9, Task 19
2-267