T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 34
Install Terminal Board:
1.
2.
3.
4.
NOTE
Use this task to install any of six terminal boards (1).
Position terminal board (1) on wall of enclosure (2).
Screw in two machine screws (3) and flat washers (4) on terminal board (1) with
screwdriver.
Using torque screwdriver and cross-tip bit, torque screws (3) between 5 and 6 pound-
inches (0.56 and 0.68 Newton meter).
Put on lacing tape.
Follow-on Maintenance:
1. Install circuit card assembly A2; refer to task 19.
2. Install relay bracket; refer to task 20.
3. Install connector bracket; refer to task 21.
4. Install power module A6; refer to task 22.
5. Install thermal system test controller; refer to para. 2-5, task 8.
6. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 18 ENDS HERE
Volume IV
Para. 2-9, Task 18
2-265