T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
TASK 18. Install Terminal Boards.
Applicability: All Models
Common Tools:
Bit, cross tip, No. 2
Screwdriver, cross tip, No. 2
Special Tools:
Wrench Set, socket, 12285468
Supplies:
NOTE: Expendable supplies are defined in volume 1, appendix C.
Tape, lacing (Item 35)
Personnel: One
Equipment Condition:
Thermal system test controlIer on a clean work surface.
Preliminary Procedure:
Remove terminal boards; refer to task 7.
2-264
Volume IV
Para. 2-9, Task 18