T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 13
Remove High Voltage Probe E1:
1.
2.
3.
4.
5.
6.
NOTE
Read paragraph 3-4 on tagging and soldering wires before
doing any work.
Unscrew and take out six machine screws (1), Iockwashers (2), and flat WasherS (3)
with screwdriver. Get rid of Iockwashers (2).
Lift handle cover (4) off of base (5).
Tag and unsolder three wires (6) from high voltage probe (7).
Unscrew and take off high voltage probe (7) from
Look at high voltage probe (7) for cracks. If bad,
for later use.
Look at electrical clip (8) for loose connection or
OK, set aside for later use.
GO TO FRAME 14
base (S).
turn in probe (7). If OK, set aside
cracks. If bad, turn in clip (8). If
Volume IV
Para. 3-6, Task 4
3-27