T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 31
Install Filter Assembly (Continued):
1.
Align RFI cover (1) so that grommet opening (2) is on same side as connector (3)
with wires (4) extending through grommet opening (2).
2. Line upholes in RFl cover (1) with holes in RFl filter assembly (5).
3.
Screw in and tighten four machine screws (6), new Iockwashers (7), flat washers (8),
and sleeve spacers (9) with cross tip screwdriver.
4. Line upholes in RFl filter assembly (5) with holes in front panel (10).
5.
Screw in and tighten four machine screws (11), new Iockwashers (12), and flat
washers (13) with cross tip screwdriver.
Follow-on Maintenance:
1. Install thermal system test controller; refer to para. 2-5, task 8.
2. install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 14 ENDS HERE
2-76/(2-77 blank)
Volume IV
Para. 2-6, Task 14