TM 5-3895-377-13&P
2-14.
OPERATING PROCEDURES.
a.
Leveling the Heater.
(1)
Remove wheel chocks (1) from stowage bracket (2).
(2)
Place wheel chocks (1) against wheels (3).
(3)
Pull pin (4) and allow screw jack (5) to swing down.
(4)
Position screw jack (5) on upper mount (6) or lower mount (7) as needed.
(5)
Install pin (4) in screw jack (5).
(6)
Remove sand pad from stowage box and place under base of screw jack (5).
(7)
Repeat steps (3) through (6) for three remaining screw jacks.
WARNING
Do not lift wheels off ground when leveling Heater. This can create an unstable
condition which may result in injury to personnel and/or equipment damage.
(8)
Raise screw jacks (5) by turning handle (8) until Heater is level.
2-17