TM 5-3895-377-13&P
2-14.
OPERATING PROCEDURES (CONT).
(i)
Remove handles (8 and 10) from stowage box.
(j)
Install handle (8) on valve No. 1 (9).
(k)
Install handle (10) on valve No. 3 (11).
(l)
Turn handles (8 and 10) until valves (9 and 11) are in the "OPEN" position.
(m) Check for leaks If leaks are present, close valves and check connections for proper fit
2-22