TM 5-3895-377-13&P
2-14.
OPERATING PROCEDURES (CONT).
(h)
Remove handle 71 from stowage box
(i)
Install handle (71 on Valve No 2 i(8) and turn handle until valve is In the "OPEN" position.
(j)
Remove handle (7) from Valve No. 2 (8).
(k)
Install handle (7} on Valve No 3 (9) and turn handle until valve is in the "OPEN" position.
NOTE
Ensure that Valve No 1 is in the "CLOSED" position to allow proper pumping operation
(l)
Check for leaks If leaks are present, close valves and check connections for proper fit.
2-24