TM 9-4520-271-14
0054 00
INSTALLATION
Continued
8.
Aline front mounting holes and install 5 screws (6), 14 washers (5), 5 lockwashers (4), and 5 nuts (3).
9.
Tighten all hardware installed in steps 7 and 8 above.
10. Connect hose (2) and tighten clamp (1).
11. Tighten all hardware installed during assembly procedure.
END OF WORK PACKAGE
0054 00-11/12 blank