T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P - 2
FRAME 2
Install Bracket:
1. Line up holes in connector bracket (1) with holes in electrical load bank A5 (2).
2. Screw in four machine screws (3) and flat washers (4) with screwdriver.
3. Using torque screwdriver and bit, torque screws (3) between 12 and 15 pound-inches
(1.4 and 1.7 Newton meters).
Follow-on Maintenance:
1. Install electrical load bank A5; refer to task 16.
2. Install thermal system test controller; refer to para. 2-5, task 8.
3. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 15 ENDS HERE
Volume IV
Para. 2-11, Task 15
2-315