T M 9 - 4 9 3 1 - 3 8 1 - 1 4 8 P - 2
TASK 16. install Electrical Load Bank A5.
AppIicability: All Models
Common Tools:
Screwdriver, cross tip, No. 2
Special Tools: None
Supplies:
Lockwasher (96906) MS35338-135 (four required)
Lockwasher (96906) MS35338-138 (six required)
Personnel: One
Equipment Condition:
Thermal system test controlIer on a clean work surface.
Preliminary Procedure:
Remove electrical load bank A5; refer to task 1.
2-316
Volume IV
Para. 2-11, Task 16