TM 9-4931-381-14&P-2
FRAME 5.3
Replace Terminal Lug (Continued):
1.
2.
3.
4.
Line up hole in lug (1) with hole in cannister can (2).
Screw in and tighten screw (3), new Iockwasher (4), flat washer (5), and nut (6) with
cross tip screwdriver and straight nose pliers.
Apply thin film of grease to threads of cannister cap (7) with brush.
Screw on and hand-tighten retaining ring (8) to cannister cap (7). Slide protective
covers (9 and 10) on cannister (11).
TO FRAME 5.4
Volume IV
Para. 3-6, Task 2
Change
1
3-16.3/(3-16.4
blank)