T M 9 - 4 9 3 1 - 3 8 1 - 1 4 & P -2
FRAME 15
Install Terminal Lug and Electrical-Mechanical Post:
1.
2.
3.
4.
5.
6.
Line up hole in new post (1) with hole in chassis (2) and screw in screw (3) new
Iockwasher (4), and washer (5) with screwdriver and wrenches.
Using torque screwdriver and bit, torque screw (3) between 6 and 7 Pound-inches
(0.68 and 0.79 Newton meter).
Line up hole in new terminal lug (6) with hole in post (1) and screw in screw (7), new
Iockwasher (8), and washer (9) with screwdriver.
Using torque screwdriver and bit, torque screw (7) between 6 and 7 pound-inches
(0.68 and 0.79 Newton meter).
NOTE
If replacing only post (1), go to step 6.
Solder wires (10) to terminal lug (6).
Put lacing tape on wires (10) as needed.
Follow-on Maintenance:
1. Install electrical load bank A5; refer to task 16.
2. Install thermal system test controller; refer to para. 2-5, task 8.
3. Install thermal system test controller case cover; refer to volume 1, para. 4-18.
TASK 9 ENDS HERE
Volume IV
Para. 2-11, Task 9
2-303